# Waukesha Bearings to expand Antigo, Wisconsin manufacturing facility

Waukesha Bearings unveiled plans to add a nearly 35,000 sq ft extension to its Antigo, Wisconsin plant, bringing the facility to nearly 100,000 sq ft. Completion is scheduled for January 2020. The announcement is dated July 23, 2019.

- Type: Expansion
- Announced: 2019-07-23
- Where: Antigo, Wisconsin, United States
- Status: announced
- Capacity: approximately 35,000 sq ft extension; facility to total nearly 100,000 sq ft
- Products: hydrodynamic bearings, active magnetic bearing systems, seal technologies
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [Waukesha Bearings](https://endata.com/companies/5311.md)
- [Dover Precision Components](https://endata.com/companies/5312.md) (partner)
- [General Dynamics Electric Boat](https://endata.com/companies/5313.md) (customer)

## Sources

- [gascompressionmagazine.com](https://gascompressionmagazine.com/2019/07/23/waukesha-bearings-grows-us-footprint/), 2019-07-23: "The new construction will be nearly 35,000 sq.ft. (3251 m 2) extension of the current building."
- [empoweringpumps.com](https://empoweringpumps.com/waukesha-bearings-to-expand-u-s-manufacturing-facility/), 2019-07-23: "The new construction is a nearly 35,000 square foot extension of the current building at 703 Amron Avenue."
- [antigotimes.com](https://antigotimes.com/stories/waukesha-bearings-to-expand-us-manufacturing-facility,188843), 2019-08-01: "The new construction is a nearly 35,000 square foot extension of the current building at 703 Amron Avenue."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
