# Ansaldo Energia wins order for 800 MW power train at Edison Marghera Levante

Ansaldo Energia, with AC Boilers, won an order to design, build, supply, install and commission an 800 MW power train for the Edison Marghera Levante combined-cycle plant in Venice, Italy. The supply includes an H-class GT36 gas turbine, an HRSG from AC Boilers, and a 250 MW steam turbine.

- Type: Contract
- Announced: 2019-06-12
- Where: Marghera Levante, Venice, Italy
- Status: announced
- Capacity: 800 MW
- Products: gas turbine, HRSG, steam turbine, SCR system
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Ansaldo Energia](https://endata.com/companies/5573.md)
- [Edison](https://endata.com/companies/37790.md) (customer)
- [AC Boilers](https://endata.com/companies/39966.md) (supplier)

## Sources

- [acboilers.com](https://www.acboilers.com/news/power-train-800-mw-limpianto-edison-di-marghera-centrale-a-ciclo-combinato/), 2019-06-12: "Ansaldo Energia con la collaborazione di AC Boilers si è aggiudicata l’ordine per la progettazione, costruzione, fornitura, montaggio in opera ed avviamento del “Power Train” da 800 MW per l’impianto Edison di Marghera Levante."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
