# Nordex Group and FAdeA open wind turbine production plant in Córdoba, Argentina

Nordex Group and FAdeA celebrated the official opening of a wind turbine production plant in Córdoba, Argentina on June 5, 2019. The plant assembles nacelles and hubs with an annual capacity of up to 500 MW and will employ up to 100 specialists.

- Type: New facility
- Announced: 2019-06-06
- Where: Córdoba, Argentina, Argentina
- Jobs: 100
- Starts operating: Apr 2019
- Status: completed
- Capacity: 500 MW per year
- Products: wind turbine nacelles, hubs
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Nordex](https://endata.com/companies/3933.md)
- [FAdeA](https://endata.com/companies/39866.md) (partner)

## Sources

- [nordex-online.com](https://www.nordex-online.com/en/2019/06/nordex-group-and-fadea-celebrate-official-opening-of-a-wind-turbines-production-plant-in-cordoba-argentina/), 2019-06-06: "This factory positions the Nordex Group as a local supplier in a booming wind market with good wind conditions."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
