# Suprafilt wins pipework contract for Samlesbury wastewater plant

Suprafilt has been contracted to manufacture and supply 19 miles of pipework for a new wastewater treatment facility in Samlesbury, UK. The facility will house a 72,000m3 structure and become the largest of its type in Europe.

- Type: Contract
- Announced: 2019-05-30
- Where: Samlesbury, United Kingdom
- Status: announced
- Capacity: 72,000 m3 structure
- Products: pipework for wastewater treatment, Nereda waste water technology
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [Suprafilt](https://endata.com/companies/39682.md)

## Sources

- [lancashirebusinessview.co.uk](https://www.lancashirebusinessview.co.uk/latest-news-and-features/suprafilt-wins-waste-water-plant-contract), 2019-05-30: "Rossendale-based Suprafilt has been tasked with manufacuring and supplying 19 miles of pipework for the new waste water treatment facility at Samlesbury."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
