# Paul Wurth wins contracts to build two blast furnaces for Erdemir Group in Turkey

SMS group's Paul Wurth subsidiary has won contracts to build replacement blast furnaces for Turkey's Erdemir Group: one at Erdemir's Ereğli works (5,000 t/day) and one at Isdemir works (7,900 t/day). The furnaces are to be blown-in in March and May 2021.

- Type: Contract
- Announced: 2019-05-23
- Where: Ereğli and Isdemir, Turkey, Türkiye
- Status: announced
- Capacity: 5,000 t/day (Ereğli), 7,900 t/day (Isdemir)
- Products: blast furnaces, hot metal
- Sectors: [Steel and Metal Products](https://endata.com/sectors/steel-metal-products.md)

## Companies

- [Paul Wurth](https://endata.com/companies/18306.md) (supplier)
- [Erdemir Group](https://endata.com/companies/39536.md) (customer)

## Sources

- [aist.org](https://www.aist.org/paul-wurth-bags-order-for-two-blast-furnaces), 2019-05-23: "Paul Wurth said it was awarded the projects on an engineering and procurement basis and therefore will supply key components and supervise installation and commissioning."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
