# G&W Electric completes second facility in Bolingbrook, Illinois

G&W Electric has completed construction of a second facility in Bolingbrook, Illinois, to expand its epoxy molding process and increase manufacturing capacity for Viper Recloser and Trident Switch product lines.

- Type: Expansion
- Announced: 2019-05-21
- Where: Bolingbrook, Illinois, United States
- Starts operating: 21 May 2019
- Status: completed
- Products: epoxy insulated high voltage connectors and switches, Viper Recloser, Trident Switch
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [G&W Electric](https://endata.com/companies/39509.md)

## Sources

- [renewableenergyworld.com](https://www.renewableenergyworld.com/power-grid/transmission/gw-electric-builds-second-facility-as-part-of-headquarters-expansion/), 2019-05-21: "We are thrilled to expand our presence in Bolingbrook."
- [gwelectric.com](https://www.gwelectric.com/news/gw-electric-finalizes-headquarters-expansion-2/), 2019-05-21: "We are thrilled to expand our presence in Bolingbrook."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
