# Siemens Gamesa to supply turbines for Coyote and Oso Grande wind projects

Siemens Gamesa was selected by EDF Renewables to supply SG 4.5-145 and SWT-2.3-108 wind turbines for the Coyote project in Texas and Oso Grande project in New Mexico. Coyote is expected to complete construction in summer 2020, Oso Grande in Q4 2020.

- Type: Contract
- Announced: 2019-04-25
- Where: Scurry County, Texas; near Roswell, New Mexico, United States
- Status: announced
- Products: SG 4.5-145 wind turbines, SWT-2.3-108 wind turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Siemens Gamesa Renewable Energy](https://endata.com/companies/3169.md) (supplier)
- [EDF Renewables North America](https://endata.com/companies/4957.md) (customer)

## Sources

- [windpowerengineering.com](https://www.windpowerengineering.com/siemens-gamesa-secures-texas-and-new-mexico-wind-turbine-orders/), 2019-04-25: "Siemens Gamesa Renewable Energy (SGRE) was selected by EDF Renewables North America to supply turbines for the Coyote and Oso Grande projects in the U.S."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
