# ABB wins major HVDC order for DolWin5 offshore wind project

ABB's Power Grids business received a triple-digit million-euro order from the Aibel/Keppel FELS consortium to provide the HVDC transmission system for the DolWin5 offshore wind connection project in the North Sea, scheduled for completion in 2024.

- Type: Contract
- Announced: 2019-05-10
- Where: North Sea, Emden, Germany
- Status: announced
- Capacity: 900 MW
- Products: HVDC transmission system, converter platform, onshore converter station
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [ABB](https://endata.com/companies/1547.md)
- [TenneT](https://endata.com/companies/272.md) (customer)
- [Keppel FELS](https://endata.com/companies/5272.md) (partner)
- [Aibel](https://endata.com/companies/5721.md) (partner)

## Sources

- [new.abb.com](https://new.abb.com/news/detail/23352/abb-wins-major-order-to-transmit-wind-power-from-north-sea), 2019-05-10: "ABB’s Power Grids business has been awarded a triple digit million-euro order from the Aibel/Keppel FELS consortium, which will design, construct, and build the High Voltage Direct Current (HVDC) transmission system for the offshore wind connection project DolWin5."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
