# HANS Water and Power plans 500,000-square-foot assembly plant in Lyon Township, Michigan

HANS Water and Power, through SI Capital, received approval for a 500,000-square-foot assembly plant in Lyon Township, Michigan, to employ at least 200 people. Construction is expected to start in summer or fall 2019.

- Type: New facility
- Announced: 2019-04-08
- Where: Lyon Township, Michigan, United States
- Jobs: 200
- Status: announced
- Capacity: 500,000 square feet
- Products: water filtration devices
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [HANS Water and Power](https://endata.com/companies/38585.md)
- [SI Capital](https://endata.com/companies/38586.md) (partner)

## Sources

- [hometownlife.com](https://www.hometownlife.com/story/news/local/south-lyon/2019/04/08/hans-water-and-power-plans-500-000-square-foot-assembly-plant-lyon/3356022002/), 2019-04-08: "We are excited to move forward with permitting and are looking at construction this summer or fall"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
