# Siemens wins construction order for 1.3GW GNA 1 LNG-to-Power plant in Brazil

Siemens secured a turnkey construction order for the 1.3GW GNA 1 combined cycle power plant in Port of Açu, Brazil, with a project volume of around €1 billion. Siemens also signed a long-term service agreement.

- Type: Contract
- Announced: 2019-04-03
- Where: Port of Açu, Rio de Janeiro, Brazil
- Value: $1.12B (1.00B EUR)
- Status: under construction
- Capacity: 1.3 GW
- Products: combined cycle power plant, gas turbines, steam turbine, generators, heat recovery steam generators
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Siemens](https://endata.com/companies/301.md)
- [Siemens](https://endata.com/companies/301.md) (partner)
- [Siemens](https://endata.com/companies/301.md) (supplier)
- [BP](https://endata.com/companies/1131.md) (partner)
- [Gás Natural Açu](https://endata.com/companies/38506.md) (customer)
- [Andrade Gutierrez](https://endata.com/companies/38507.md) (partner)
- [Prumo Logística S.A.](https://endata.com/companies/38520.md) (partner)

## Sources

- [globalenergynetwork.net](https://globalenergynetwork.net/news-item/siemens-bags-construction-order-for-1-3gw-gna-1-lng-to-power-project/), 2019-04-03: "Siemens has bagged an order for the turnkey construction of a 1.3GW combined cycle power plant for the integrated LNG-to-Power project GNA 1 owned by Gás Natural Açu in Brazil."
- [power-technology.com](https://www.power-technology.com/news/siemens-power-plant-brazil/), 2019-04-03: "Siemens has secured the construction order for a new combined cycle power plant located in the Port of Açu in Rio de Janeiro, Brazil."
- [esi-africa.com](https://www.esi-africa.com/industry-sectors/generation/brazil-awards-siemens-contract-for-lng-to-power-project/), 2019-04-04: "Our participation in GNA demonstrates Siemens commitment to new commercial strategies that address the evolving challenges of an increasingly demanding energy market."
- [enerdata.net](https://www.enerdata.net/publications/daily-energy-news/siemens-wins-order-13-gw-gna-1-ccgt-power-project-brazil.html), 2019-04-05: "Gás Natural Açu (GNA) has awarded Siemens a turnkey construction contract for the 1.3 GW LNG-to-Power project GNA 1 in the Port of Açu, in the state of Rio de Janeiro, in Brazil."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
