# VM Building Solutions to expand Auby zinc plant, build logistics platform

VM Building Solutions will restructure and expand its Auby site, including a new 40,000 m² logistics platform, creating about 100 jobs. The expansion is expected to be operational in 2021.

- Type: Expansion
- Announced: 2019-03-26
- Where: Auby, Douaisis, France
- Jobs: 100
- Starts operating: 2021
- Status: announced
- Products: zinc building materials
- Sectors: [Construction Materials](https://endata.com/sectors/construction-materials.md)

## Companies

- [VM Building Solutions](https://endata.com/companies/38258.md)

## Sources

- [lobservateur.fr](https://www.lobservateur.fr/auby-vm-building-solutions-va-sagrandir/), 2019-03-26: "Notre objectif est de devenir le meilleur partenaire des professionnels du bâtiment que ce soit pour la façade ou la toiture."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
