# Boeing awarded $429M contract for Lot 11 P-8A Poseidon long lead materials

Boeing received a $428.8 million contract modification from the U.S. Department of Defense to procure long lead materials for 16 P-8A Poseidon aircraft for the U.S. Navy, New Zealand, and South Korea.

- Type: Contract
- Announced: 2019-03-01
- Where: United States
- Value: $428.8M
- Status: completed
- Products: P-8A Poseidon maritime patrol aircraft
- Sectors: [Aerospace Components](https://endata.com/sectors/aerospace-components.md)

## Companies

- [Boeing](https://endata.com/companies/685.md) (supplier)
- [U.S. Navy](https://endata.com/companies/4174.md) (customer)
- [New Zealand](https://endata.com/companies/37701.md) (customer)
- [South Korea](https://endata.com/companies/37702.md) (customer)

## Sources

- [govconwire.com](https://www.govconwire.com/articles/boeing-awarded-429m-for-lot-11-poseidon-aircraft-long-lead-materials), 2019-03-01: "The modification funds procurement of items needed to build six P-8As for the U.S. Navy, four for New Zealand and another six for South Korea."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
