# NovaWind to build wind turbine manufacturing plant in Volgodonsk

NovaWind, a Rosatom division, will invest 955 million rubles to build a wind turbine components assembly plant in Volgodonsk, Rostov Region, Russia. The facility will create 254 jobs and have a capacity of 96 sets per year.

- Type: New facility
- Announced: 2019-02-15
- Where: Volgodonsk, Rostov Region, Russia
- Value: $14.5M (955.0M RUB)
- Jobs: 254
- Status: announced
- Capacity: 96 sets per year
- Products: wind turbine generators, nacelles
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [NovaWind](https://endata.com/companies/37360.md)
- [Rosatom](https://endata.com/companies/257.md) (investor)
- [Lagerwey](https://endata.com/companies/24988.md) (partner)
- [Red Wind](https://endata.com/companies/37361.md) (partner)

## Sources

- [neftegazru.com](https://neftegazru.com/news/nuclear-power/406471-novawind-will-invest-955-mln-rub-in-the-construction-of-a-wind-turbine-manufacturing-plant-in-volgodonsk/), 2019-02-15: "The estimated cost of the project will be around 955 million rubles."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
