# InterGen starts £100M expansion of Spalding Power Station

InterGen has started construction on a £100 million expansion of Spalding Power Station, adding a 300MW open-cycle gas turbine. The project is due for operation in summer 2019 and will create up to 140 construction jobs.

- Type: Expansion
- Announced: 2019-02-08
- Where: Spalding, Lincolnshire, United Kingdom
- Value: $129.0M (100.0M GBP)
- Jobs: 140
- Starts operating: Q3 2019
- Status: under construction
- Capacity: 300 MW
- Products: electricity
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [InterGen](https://endata.com/companies/29033.md)

## Sources

- [lincsonline.co.uk](https://www.lincsonline.co.uk/spalding/news/spalding-power-expansion-under-way-9061384/), 2019-02-08: "A £100million expansion of Spalding Power Station, creating up to 140 jobs, is under way."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
