# OMK contracts Danieli for new seamless pipe complex at Vyksa

OMK has contracted Danieli to build a new seamless pipe complex at Vyksa Steel Works in Russia, with a capacity of 500,000 tpy of OCTG seamless pipes. The plant is scheduled to be commissioned in 2021.

- Type: Contract
- Announced: 2019-02-08
- Where: Vyksa, Russia, Russia
- Status: announced
- Capacity: 500,000 tpy
- Products: OCTG seamless pipes, casing, tubing, linepipe, industrial pipes
- Sectors: [Steel and Metal Products](https://endata.com/sectors/steel-metal-products.md)

## Companies

- [OMK](https://endata.com/companies/1118.md) (customer)
- [Danieli](https://endata.com/companies/15743.md) (supplier)

## Sources

- [dca.it](https://www.dca.it/en/news/omk-contracts-danieli-for-a-new-pipe-complex-for-the-production-of-oil-and-gas-seamless-pipes_12_390.htm), 2019-02-08: "We are pursuing our long-term strategy of developing an integrated product offering."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
