# Tatenergo plans 66.5B ruble modernization of Zainskaya GRES

Tatenergo plans to replace 11 old power units at Zainskaya GRES with two Siemens gas turbines of 593 MW each, at a cost of 66.5 billion rubles, with construction taking four years.

- Type: Investment
- Announced: 2019-02-06
- Where: Zainsk, Tatarstan, Russia, Russia
- Value: $1.00B (66.5B RUB)
- Status: announced
- Capacity: 1,682 MW
- Products: gas turbines, combined-cycle gas turbine units
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Tatenergo](https://endata.com/companies/37156.md)
- [Siemens](https://endata.com/companies/301.md) (supplier)

## Sources

- [kommersant.ru](https://www.kommersant.ru/doc/3875343), 2019-02-06: "Стоимость проекта — 66,5 млрд руб., строительство займет четыре года."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
