# Siemens plans to fully localize gas turbine production in Russia by 2024-2025

Siemens announced plans to increase localization of gas turbine production in Russia to 100% by 2024-2025, up from 62% currently, through its joint venture Siemens Gas Turbine Technologies in the Leningrad Region.

- Type: Expansion
- Announced: 2019-01-22
- Where: Leningrad Region, Russia
- Starts operating: 2024
- Status: announced
- Products: gas turbines, SGT5-2000E, SGT5-4000F, H100
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Siemens](https://endata.com/companies/301.md)
- [Siemens](https://endata.com/companies/301.md) (partner)
- [Power Machines](https://endata.com/companies/15083.md) (partner)
- [Siemens Technologies Gas Turbines](https://endata.com/companies/34160.md) (partner)
- [Tatenergo](https://endata.com/companies/37156.md) (partner)

## Sources

- [tek-all.ru](https://www.tek-all.ru/en/news/id5711-siemens-is-ready-to-completely-localize-the-production-of-gas-turbines-by-2024-2025/), 2019-01-22: "Siemens is ready to increase the localization of gas turbine production to 100% by 2024-2025."
- [kommersant.ru](https://www.kommersant.ru/doc/3875343), 2019-02-06: "компания выйдет на уровень локализации в 70% до 2020 года, а на 100% — к 2025 году"
- [ria.ru](https://ria.ru/20190306/1551598213.html), 2019-02-07: "У нас уже достигнут уровень локализации газовой турбины SGT 5-2000 E более 60%, а к 2024-2025 году мы будем готовы к 100% локализации при экономически обоснованном числе заказов на эти турбины на ближайшие 10-15 лет."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
