# Vestas receives 359-MW repowering order for three Texas wind farms

Vestas received a 359-MW order from Phoenix Wind Repower to repower three Texas wind projects (Trinity Hills, Sherbino Mesa II, Silver Star) by replacing Clipper turbines with V110-2.2 MW turbines. The order includes supply, installation, commissioning, and a 10-year service agreement.

- Type: Contract
- Announced: 2018-12-27
- Where: Texas, United States
- Status: announced
- Capacity: 359 MW
- Products: V110-2.2 MW wind turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Vestas](https://endata.com/companies/1364.md)
- [Ares Management](https://endata.com/companies/7464.md) (investor)
- [Phoenix Wind Repower](https://endata.com/companies/36400.md) (customer)

## Sources

- [windpowerengineering.com](https://www.windpowerengineering.com/vestas-secures-its-largest-repowering-order-to-date/), 2018-12-27: "Vestas has received a 359-MW order to repower a portfolio of three projects in Texas from Phoenix Wind Repower."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
