# Elgaugol assembles two excavators at Elga coal complex

Elgaugol is assembling two powerful excavators at its Elga coal complex, supplied by Uralmashzavod. Investment totaled 1.8 billion rubles. The EKG-18 excavator will be completed in late January 2019, and the ESh 20-90 C excavator is scheduled for commissioning in June 2019.

- Type: Investment
- Announced: 2018-12-24
- Where: Elga coal complex, Russia
- Starts operating: Jan 2019
- Status: under construction
- Products: EKG-18 excavator, ESh 20-90 C excavator
- Sectors: [Mining Equipment](https://endata.com/sectors/mining-equipment.md)

## Companies

- [Elgaugol](https://endata.com/companies/36375.md)
- [Uralmashzavod](https://endata.com/companies/20189.md) (supplier)

## Sources

- [metalukraine.com](https://metalukraine.com/2018/12/24/russia-elgaugol-assembling-powerful-excavators.html), 2018-12-24: "These are the first excavators with the ladle of 18 and 20 cubic meters at Elga."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
