# Siemens wins contract for 600MW gas-fired power plant at EGA smelter in Dubai

Siemens won a contract to supply an H-class gas turbine for a 600MW combined cycle power plant at Emirates Global Aluminum's smelter in Jebel Ali, Dubai. The plant will be built by a joint venture between Dubal and Mubadala, with EGA buying power for 25 years.

- Type: Contract
- Announced: 2018-12-20
- Where: Jebel Ali, Dubai, United Arab Emirates
- Value: $272.3M
- Status: announced
- Capacity: 600 MW
- Products: H-class gas turbine, combined cycle power plant
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Siemens](https://endata.com/companies/301.md) (supplier)
- [Dubal Holding](https://endata.com/companies/36238.md) (partner)
- [Emirates Global Aluminum](https://endata.com/companies/36331.md) (customer)
- [Mubadala](https://endata.com/companies/36332.md) (partner)

## Sources

- [nsenergybusiness.com](https://www.nsenergybusiness.com/contracts/siemens-600mw-power-plant-dubai/), 2018-12-20: "The choice of H-class technology for the EGA smelter reinforces our strategy that highly-efficient, gas-fired power generation is just as important for industry as it is for powering countries."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
