# Nordex to set up wind turbine assembly line in Córdoba, Argentina

Nordex Group has entered an agreement with FAdeA to establish a local assembly line for nacelles and hubs of AW3000 turbines in Córdoba, Argentina. The facility will have an annual capacity of up to 150 turbines and is expected to start operation in 2019.

- Type: New facility
- Announced: 2018-12-20
- Where: Córdoba, Argentina
- Jobs: 100
- Starts operating: 2019
- Status: announced
- Capacity: 150 turbines per year
- Products: wind turbines, nacelles, hubs
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Nordex](https://endata.com/companies/3933.md)
- [Fábrica Argentina de Aviones](https://endata.com/companies/36322.md) (partner)

## Sources

- [nordex-online.com](https://www.nordex-online.com/en/2018/12/nordex-collaborates-with-fabrica-argentina-de-aviones-to-set-up-local-manufacturing-capacity-in-argentina/), 2018-12-20: "In 2019 a new assembly line for wind turbines will be set up in Córdoba"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
