# Latécoère to expand Montredon plant with €10M building

Latécoère will extend its new factory in Toulouse-Montredon, France, with a 3,000 m² building for surface treatment and painting activities. The €10 million investment is expected to be delivered in the second half of 2019.

- Type: Expansion
- Announced: 2018-12-18
- Where: Toulouse-Montredon, France, France
- Value: $11.4M (10.0M EUR)
- Starts operating: Q3 2019
- Status: announced
- Products: metal parts for aircraft doors and fuselage sections, surface treatment, painting
- Sectors: [Aerospace Components](https://endata.com/sectors/aerospace-components.md)

## Companies

- [Latecoere](https://endata.com/companies/17396.md)

## Sources

- [lejournaldesentreprises.com](https://www.lejournaldesentreprises.com/breve/latecoere-va-etendre-son-usine-40-de-montredon-134884), 2018-12-18: "Le chantier d'un nouveau bâtiment de 3000 m2 va être lancé pour accueillir de nouvelles activités de traitement de surface et de peinture."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
