# Freeport-McMoRan builds $4.5M wastewater treatment plant in Morenci, Arizona

Freeport-McMoRan Morenci built a new $4.5 million wastewater treatment plant in Morenci, Arizona, to replace an outdated facility and support mine expansion. The plant was designed and constructed by Evoqua Water Technologies.

- Type: New facility
- Announced: 2018-12-01
- Where: Morenci, Ariz., United States
- Value: $4.50M
- Starts operating: Dec 2018
- Status: completed
- Capacity: 347 gpm
- Products: wastewater treatment system
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [Freeport-McMoRan](https://endata.com/companies/16157.md)
- [Evoqua Water Technologies](https://endata.com/companies/10440.md) (partner)

## Sources

- [wwdmag.com](https://www.wwdmag.com/top-projects/article/10937293/evoqua-water-technologies-freeport-mcmoran-morenci-wastewater-treatment-plant), 2018-12-13: "The project specification identified major components of the system and established minimum performance, quality, control and monitoring standards for each component."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
