# Northrop Grumman awarded $49.9M for E-2D aircraft long-lead parts

Northrop Grumman Systems Corp. received a $49,885,708 modification to a contract for long-lead parts and support for two Lot 7 E-2D Advanced Hawkeye aircraft, with work expected to be completed by December 2023.

- Type: Contract
- Announced: 2018-12-10
- Where: Melbourne, Florida, United States
- Value: $49.9M
- Status: announced
- Products: E-2D Advanced Hawkeye aircraft
- Sectors: [Aerospace Components](https://endata.com/sectors/aerospace-components.md)

## Companies

- [Northrop Grumman Systems Corp.](https://endata.com/companies/35992.md)

## Sources

- [defensedaily.com](https://www.defensedaily.com/contract-awards/contract-award-northrop-grumman-systems-corp-aerospace-systems-melbourne-florida-49885708/), 2018-12-10: "Northrop Grumman Systems Corp., Aerospace Systems, Melbourne, Florida, is awarded $49,885,708 for firm-fixed-price modification P00004 to a previously awarded advance acquisition contract."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
