# PM approves expansion of Long Son cement plant in Thanh Hoa

The Prime Minister approved the second phase of Long Son cement plant, adding two production lines (lines 3 and 4) each with a capacity of 2.3 million tonnes of cement per year. Line 3 is expected to begin operation in 2020 and line 4 in 2021.

- Type: Expansion
- Announced: 2018-12-03
- Where: Thanh Hoa province, Vietnam
- Starts operating: 2020
- Status: announced
- Capacity: 2.3 million tonnes per year per line
- Products: cement, sulphate-resistant cement
- Sectors: [Construction Materials](https://endata.com/sectors/construction-materials.md)

## Companies

- [Long Son cement plant](https://endata.com/companies/35930.md)

## Sources

- [en.vietstock.vn](https://en.vietstock.vn/2018/12/pm-approves-expansion-of-long-son-cement-plant-974-341780.htm), 2018-12-06: "The Prime Minister agreed to add the second phase of the Long Son cement plant with two production lines"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
