# Daechang Solution wins KRW 17B steel casting supply contract with GE Power

Daechang Solution signed a long-term agreement with GE Power to supply steel castings for generator steam turbines, valued at KRW 17 billion, covering about 90% of GE's needs for nuclear power plants over five years. The contract was signed on October 16, 2018 in Wroclaw, Poland.

- Type: Contract
- Announced: 2018-10-16
- Where: Wroclaw, Poland
- Value: $15.0M (17.0B KRW)
- Status: announced
- Products: steel castings for generator steam turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Daechang Solution](https://endata.com/companies/34970.md)
- [GE Power](https://endata.com/companies/2749.md) (customer)

## Sources

- [etoday.co.kr](https://www.etoday.co.kr/news/view/1675604), 2018-10-18: "GE Power와 발전기 증기터빈용 주강 부품을 장기간 공급하는 협약을 체결했다."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
