# Thyssenkrupp India wins $115M coal handling systems contract from Doosan Power Systems India

Thyssenkrupp India will supply complete coal handling systems for the Jawaharpur and Obra C power plants in Uttar Pradesh, India, under a $115 million contract from Doosan Power Systems India.

- Type: Contract
- Announced: 2018-10-11
- Where: Uttar Pradesh, India, India
- Value: $115.0M
- Status: announced
- Capacity: 3,000 tons per hour each
- Products: coal handling systems, belt conveyors, wagon tipplers, screens and crushers, bucket wheel stackers/reclaimers
- Sectors: [Material Handling](https://endata.com/sectors/material-handling.md)

## Companies

- [Doosan Power Systems India](https://endata.com/companies/18911.md) (customer)
- [Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited](https://endata.com/companies/18912.md) (partner)
- [Thyssenkrupp India](https://endata.com/companies/34841.md) (supplier)

## Sources

- [railwaysreview.com](https://www.railwaysreview.com/thyssenkrupp-india-bags-usd-115-million-contract-for-coal-handling-systems-from-doosan-power-systems-india/), 2018-10-11: "Effective material handling systems must be individually designed and fully integrated so as to achieve a smooth flow of material from one section of a plant to the next."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
