# SUEZ selected for Barrie wastewater MBR upgrade

SUEZ was selected by the city of Barrie, Ontario, to supply ZeeWeed 500D MBR technology for a wastewater treatment plant upgrade. The project will be one of the largest MBR plants in Canada, with equipment delivery expected in 2021 and operation in 2022-2023.

- Type: Contract
- Announced: 2018-10-01
- Where: Barrie, Ontario, Canada
- Status: announced
- Capacity: 55 MLD (membrane), 76 MLD total
- Products: ZeeWeed 500D Membrane Bioreactor (MBR) technology
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [Suez](https://endata.com/companies/1259.md) (supplier)
- [City of Barrie](https://endata.com/companies/34642.md) (customer)

## Sources

- [wateronline.com](https://www.wateronline.com/doc/city-of-barrie-ontario-selects-suez-technology-to-meet-wastewater-effluent-limits-for-phosphorous-0001), 2018-10-01: "SUEZ’s cost-effective MBR solution will be retrofitted into our existing tanks, which will not only allow us to meet these stringent requirements, but will also reduce installation costs by using existing infrastructure."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
