# TechnipFMC wins EPCI contract for Mero 1 pre-salt field from Petrobras

TechnipFMC won an engineering, procurement, construction and installation contract from Petrobras for the Mero 1 pre-salt field offshore Brazil, with production expected to start in 2021. The contract value is reported as a range of 500 million to 1 billion dollars.

- Type: Contract
- Announced: 2019-02-06
- Where: Santos Basin, offshore Brazil, Brazil
- Status: announced
- Capacity: FPSO production capacity of 180,000 barrels of oil per day
- Products: subsea rigid lines, risers, flowlines, EPCI services

## Companies

- [TechnipFMC](https://endata.com/companies/1151.md) (partner)
- [Petrobras](https://endata.com/companies/2820.md) (customer)

## Sources

- [investing.com](https://www.investing.com/analysis/technipfmc-wins-epci-contract-for-mero-1-field-from-petrobras-200384256), 2019-02-06: "TechnipFMC plc (NYSE: FTI) recently announced that it has won an engineering, procurement, construction and installation (EPCI) contract for the Mero 1 pre-salt field, located offshore Brazil."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
