# Sanral awards R1.65bn Msikaba bridge contract to Concor Mota-Engil JV

The South African National Roads Agency Limited (Sanral) awarded a R1.65 billion contract to the Concor Mota-Engil joint venture to build the Msikaba bridge near Lusikisiki, South Africa. Construction is due to start in February 2019 and will last 33 months.

- Type: Contract
- Announced: 2018-09-20
- Where: near Lusikisiki, over the Msikaba gorge, South Africa
- Status: announced
- Products: bridge construction
- Sectors: [Construction Materials](https://endata.com/sectors/construction-materials.md)

## Companies

- [Concor](https://endata.com/companies/9616.md) (supplier)
- [Sanral](https://endata.com/companies/34428.md) (customer)
- [Mota-Engil](https://endata.com/companies/34429.md) (supplier)

## Sources

- [engineeringnews.co.za](https://www.engineeringnews.co.za/article/sanral-awards-r165bn-msikaba-megabridge-contract-to-concor-mota-engil-jv-2018-09-20), 2018-09-20: "Sanral has awarded the Concor Mota-Engil joint venture (JV) the second of two megabridge construction contracts as part of the N2 Wild Coast project."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
