# Doosan Heavy Industries wins KRW 719.2B equipment supply contract for Gangneung power plant

Doosan Heavy Industries signed a contract with Samsung C&T to supply boilers and turbine generators for Units 1 and 2 of the Gangneung Anin coal-fired power plant in Gangwon Province, South Korea, valued at KRW 719.2 billion.

- Type: Contract
- Announced: 2018-08-28
- Where: Gangneung, Gangwon Province, South Korea
- Value: $64.0M (71.9B KRW)
- Status: announced
- Capacity: 1040 MW
- Products: boilers, turbine generators
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Doosan Heavy Industries](https://endata.com/companies/555.md)
- [Samsung C&T](https://endata.com/companies/4037.md) (customer)

## Sources

- [viva100.com](https://www.viva100.com/article/201808284173728), 2018-08-28: "두산중공업은 삼성물산과 강원 강릉시 안인화력발전소 1·2호기에 사용될 1040㎿ 규모의 보일러와 터빈발전기 기자재 공급을 위한 용역 공급계약을 체결했다."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
