# Transneft-TSD completes electric motor plant in Chelyabinsk, Russia

OOO Transneft-TSD completed construction of a new plant in Chelyabinsk, Russia, for the production of high-voltage electric motors, with capacity to produce up to 300 motors per year for pipeline pumping units.

- Type: New facility
- Announced: 2018-08-20
- Where: Chelyabinsk, Russia
- Starts operating: 20 Aug 2018
- Status: completed
- Capacity: 300 high-voltage electric motors per year
- Products: high-voltage electric motors
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [Transneft-TSD](https://endata.com/companies/33832.md)
- [Transneft](https://endata.com/companies/21030.md) (investor)
- [KONAR](https://endata.com/companies/21031.md) (investor)
- [Russian Electric Motors](https://endata.com/companies/27585.md) (investor)

## Sources

- [74.ru](https://74.ru/text/gorod/2018/08/20/65276351/), 2018-08-20: "ООО «Транснефть — ТСД» завершило строительство нового завода в Челябинске."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
