# Bedford Pumps wins £1.2M pump supply contract for Birmingham Resilience scheme

Bedford Pumps Ltd won the third and final order to supply pumps for Severn Trent Water's Birmingham Resilience project, a £300 million scheme. The £1.2 million contract covers fifteen pumps for a new pumping station at Lickhill near Stourport.

- Type: Contract
- Announced: 2018-08-03
- Where: Lickhill near Stourport, United Kingdom
- Value: $1.56M (1.20M GBP)
- Status: announced
- Products: vertical suspended mixed flow bowl pumps, canister mixed flow bowl pumps, horizontal dry well inline mixed flow bowl pumps
- Sectors: [Pumps and Valves](https://endata.com/sectors/pumps-valves.md), [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [Bedford Pumps](https://endata.com/companies/2925.md)
- [Severn Trent Water](https://endata.com/companies/3685.md) (customer)

## Sources

- [waterbriefing.org](https://www.waterbriefing.org/home/contracts/item/15335-bedford-pumps-in-%C2%A312m-birmingham-resilience-scheme-contract-win), 2018-08-03: "Bedford Pumps Ltd has just won the third and final order to supply pumps for the Birmingham Resilience project"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
