# GE Power signs $1.6B contract to build Ostrołęka C power plant in Poland

GE Power signed a $1.6 billion contract with Elektrownia Ostrołęka to design and build the 1,000 MW Ostrołęka C ultra-supercritical coal power plant in northeast Poland, using GE's high-efficiency technology.

- Type: Contract
- Announced: 2018-07-12
- Where: northeast Poland, Poland
- Value: $1.60B
- Status: announced
- Capacity: 1,000 MW
- Products: ultra-supercritical coal power plant, boiler, steam turbine generator, air quality control systems
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [GE Power](https://endata.com/companies/2749.md) (supplier)
- [Elektrownia Ostrołęka sp. z o.o.](https://endata.com/companies/31126.md) (customer)

## Sources

- [ge.com](https://www.ge.com/news/press-releases/ge-power-signs-contract-elektrownia-ostro%C5%82%C4%99ka-build-ostro%C5%82%C4%99ka-c-polands-next-power), 2018-07-12: "Today's signing with Elektrownia Ostrołęka marks a significant milestone."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
