# Edina wins contract for 2MWe CHP plant at Cranbrook Energy Centre

Edina has been awarded a contract by E.ON to supply and install a 2MWe gas-fired combined heat and power (CHP) plant at the Cranbrook Energy Centre in east Devon, UK. The plant will use an MWM TCG 2020 V20 gas engine.

- Type: Contract
- Announced: 2018-06-14
- Where: Cranbrook, east Devon, United Kingdom
- Status: announced
- Capacity: 2 MWe
- Products: gas-fired combined heat and power (CHP) plant, MWM TCG 2020 V20 gas engine
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Edina](https://endata.com/companies/4032.md)
- [E.ON](https://endata.com/companies/7776.md) (customer)
- [MWM](https://endata.com/companies/21184.md) (supplier)

## Sources

- [edina.eu](https://www.edina.eu/news/cranbrook-energy-centre), 2018-06-14: "Edina, has been awarded the contract to supply and install a 2MWe gas-fired combined heat and power (CHP) plant at one of the largest new-build district heating schemes in the UK at Cranbrook Energy Centre."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
