# E.K. Machine breaks ground on $5M Fall River, Wisconsin power products facility

E.K. Machine broke ground on a new manufacturing facility for its Power Products division at its Fall River, Wisconsin site, with construction due for completion by June 2019 and 20 new jobs planned.

- Type: Expansion
- Announced: 2018-12-07
- Where: Fall River, Wisconsin, United States
- Value: $5.00M
- Jobs: 20
- Status: under construction
- Products: power products
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [E.K. Machine](https://endata.com/companies/4300.md)

## Sources

- [wiscnews.com](https://wiscnews.com/news/local/article_481d2d7a-7866-5b4e-8b89-ea2464e1b94d.html), 2018-12-07: "Construction should be completed by June of 2019."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
