# Global Water Engineering to supply wastewater pretreatment facility for Molson Coors brewery

Global Water Engineering will provide a high-rate wastewater pretreatment facility for the new Molson Coors brewery in Fraser Valley, British Columbia. The facility, built by the City of Chilliwack, will use anaerobic digestion to produce biogas, potentially generating 300 MW per year.

- Type: Contract
- Announced: 2018-06-06
- Where: Fraser Valley, British Columbia, Canada
- Status: announced
- Capacity: 300 MW per year
- Products: wastewater pretreatment facility, anaerobic digestion system, biogas
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [Global Water Engineering](https://endata.com/companies/31099.md) (supplier)
- [City of Chilliwack](https://endata.com/companies/32366.md) (partner)
- [Molson Coors Brewing Company](https://endata.com/companies/32404.md) (customer)

## Sources

- [bioenergy-news.com](https://www.bioenergy-news.com/news/300mw-a-year-ad-facility-for-canadian-brewery/), 2018-06-06: "As a bonus, the plant will also be able to produce biogas from the anaerobic digestion process."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
