# Bürkert begins expansion of Menden site near Dortmund

Bürkert Fluid Control Systems broke ground on 3 December 2018 for an extension at its Menden site, doubling production and office space to about 5,500 m2 within a year. The system house will grow from 52 to 80 staff over the next six to eight years.

- Type: Expansion
- Announced: 2018-12-04
- Where: Menden, near Dortmund, Germany
- Status: under construction
- Capacity: production area from 1,500 m2 to 4,100 m2
- Products: fluid control systems, control cabinets, welded system solutions
- Sectors: [Pumps and Valves](https://endata.com/sectors/pumps-valves.md), [Automation and Robotics](https://endata.com/sectors/automation-robotics.md)

## Companies

- [Bürkert Fluid Control Systems](https://endata.com/companies/4272.md)

## Sources

- [presseradar.de](https://www.presseradar.de/2018/12/04/startschuss-fuer-umfangreiche-investition-am-buerkert-standort-menden/), 2018-12-04: "Der offizielle Spatenstich am 3. Dezember 2018 für den geplanten Erweiterungsbau in Menden bei Dortmund stellt den Auftakt für die nächste Phase dar."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
