# Joint venture begins construction of gas turbine plant in Rybinsk, Russia

Construction began on a plant in Rybinsk, Yaroslavl Oblast, to produce GE 6FA gas turbine units. The plant is a joint venture between GE (50%), Inter RAO (25%), and Rostec (25%), with investment of 5 billion rubles. Commissioning is planned for Q2 2014.

- Type: New facility
- Announced: 2018-05-25
- Where: Rybinsk, Yaroslavl Oblast, Russia
- Value: $80.0M (5.00B RUB)
- Starts operating: Q2 2014
- Status: under construction
- Capacity: 14 units per year
- Products: gas turbine units 6FA
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Russian Gas Turbines](https://endata.com/companies/32077.md)
- [GE](https://endata.com/companies/1022.md) (partner)
- [Rostec](https://endata.com/companies/8731.md) (partner)
- [Inter RAO](https://endata.com/companies/19600.md) (partner)

## Sources

- [yaelektroidom.ucoz.com.br](http://yaelektroidom.ucoz.com.br/news/v_jaroslavskoj_oblasti_nachalos_stroitelstva_zavoda_gazoturbinnykh_ustanovok/2018-05-25-560), 2018-05-25: "В окрестностях города Рыбинск Ярославской области состоялась торжественная церемония начала строительства завода по производству газотурбинных установок 6FA General Electric."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
