# Primus Power receives flow battery order from Anglo American Platinum

Anglo American Platinum ordered eight Primus Power EnergyPod 2 flow batteries (200kW/1,000kWh) for its Amandebult mine in Limpopo, South Africa, to manage peak grid power use.

- Type: Contract
- Announced: 2018-04-25
- Where: Amandebult mine, Limpopo province, South Africa
- Status: announced
- Capacity: 200kW / 1,000kWh
- Products: flow batteries, EnergyPod 2
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Anglo American Platinum](https://endata.com/companies/3776.md) (customer)
- [Primus Power](https://endata.com/companies/31546.md) (supplier)

## Sources

- [energy-storage.news](https://www.energy-storage.news/primus-gets-south-africa-flow-battery-order-from-supplier-investor-anglo-american-platinum/), 2018-04-25: "A mining operation in South Africa will start managing the cost of its consumed energy with the deployment of eight flow batteries from Primus Power."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
