# Capstone secures 2.4 MW FPP service contracts with oil & gas producer

Capstone Turbine secured multiple Factory Protection Plan long-term service contracts covering 2.4 MW for two C200 microturbines and two C1000 systems at oil and gas locations in the Appalachian Basin, bringing total FPP coverage with the customer to 9.3 MW.

- Type: Contract
- Announced: 2018-04-09
- Where: Appalachian Basin, United States
- Status: announced
- Capacity: 2.4 MW
- Products: microturbine energy systems, Factory Protection Plan service contracts
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Capstone Turbine Corporation](https://endata.com/companies/31217.md)
- [E-Finity Distributed Generation](https://endata.com/companies/31218.md) (partner)

## Sources

- [einpresswire.com](https://www.einpresswire.com/article/441078726/capstone-secures-follow-on-2-4-mw-fpp-long-term-service-contracts-with-key-oil-gas-producer), 2018-04-09: "Capstone Turbine Corporation announced today that it has secured multiple significant Factory Protection Plan (FPP) aftermarket long-term service contracts as follow-on orders to the 6.9 megawatt (MW) multimillion-dollar contract signed back in early January 2018."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
