# AMECO completes first stage commissioning of portal reclaimer for SOCAR urea plant

AMECO completed the first stage commissioning of a 43-meter rail span portal reclaimer for SOCAR's new urea plant in Sumqayit, Azerbaijan. The equipment handles 210 TPH of urea with a storage capacity exceeding 60,000 tons.

- Type: Contract
- Announced: 2018-03-20
- Where: Sumqayit, near Baku, Azerbaijan
- Status: completed
- Capacity: 210 TPH of urea, storage capacity exceeding 60,000 tons
- Products: portal reclaimer
- Sectors: [Material Handling](https://endata.com/sectors/material-handling.md)

## Companies

- [SOCAR](https://endata.com/companies/7439.md) (customer)
- [AMECO](https://endata.com/companies/30848.md) (supplier)
- [Samsung Engineering and Construction](https://endata.com/companies/30849.md) (partner)

## Sources

- [ameco-group.com](https://www.ameco-group.com/news/ameco-completes-first-stage-portal-reclaimer-commissioning-for-azerbaijan-fertilizer-plant-project/), 2018-03-20: "AMECO successfully completed the first stage commissioning of one portal reclaimer for SOCAR’s new urea plant in the industrial area of Sumqayit, near Baku."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
