# Vestas receives 50 MW wind turbine order for U.S. project

Vestas received a 50 MW order for V136-3.45 MW turbines in Power Optimised Mode, to be manufactured at its four Colorado factories.

- Type: Contract
- Announced: 2018-02-23
- Where: United States
- Status: announced
- Capacity: 50 MW
- Products: V136-3.45 MW wind turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Vestas](https://endata.com/companies/1364.md)

## Sources

- [w3.windfair.net](https://w3.windfair.net/wind-energy/news/27505-vestas-usa-mw-colorade-wind-turbine), 2018-02-23: "This order once again emphasises the 4 MW platform’s momentum in the traditionally 2 MW-dominated U.S. market."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
