# CEG opens Northmec assembly plant in Camperdown, South Africa

Capital Equipment Group (CEG), a division of Invicta Holdings, has completed a R59-million assembly plant in Camperdown, KwaZulu-Natal. The 5,500 m³ facility is now fully operational, assembling agricultural and construction equipment and forklifts.

- Type: New facility
- Announced: 2018-02-02
- Where: Camperdown, KwaZulu-Natal, South Africa
- Value: $4.60M (59.0M ZAR)
- Starts operating: 2 Feb 2018
- Status: completed
- Capacity: 5,500 m³ building on 14 hectares
- Products: agricultural equipment, construction equipment, forklift trucks
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md), [Material Handling](https://endata.com/sectors/material-handling.md)

## Companies

- [Capital Equipment Group](https://endata.com/companies/29825.md)
- [Invicta Holdings](https://endata.com/companies/785.md) (investor)
- [Macwin Construction](https://endata.com/companies/29826.md) (partner)

## Sources

- [farmersreviewafrica.com](https://farmersreviewafrica.com/6867-2/), 2018-02-02: "Northmec’s new R59-million assembly plant in Camperdown, KwaZulu-Natal, has recently been completed by Macwin Construction and is now fully operational"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
