# ABB wins order for electrical systems at Keppel Marina East Desalination Plant

ABB has won an order from Keppel Seghers to supply complete electrical, instrumentation, automation and control systems for Singapore's fourth desalination plant, the Keppel Marina East Desalination Plant. The plant will produce 30 million gallons of drinking water per day and is expected to be completed by 2020.

- Type: Contract
- Announced: 2018-01-18
- Where: Singapore, Singapore
- Status: announced
- Capacity: 30 million gallons per day
- Products: desalination plant, electrical and automation systems
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [Keppel Seghers](https://endata.com/companies/359.md) (customer)
- [ABB](https://endata.com/companies/1547.md) (supplier)
- [PUB](https://endata.com/companies/21689.md) (customer)

## Sources

- [engineering-update.co.uk](https://engineering-update.co.uk/2018/01/18/abb-to-power-pioneering-dual-mode-water-facility-in-singapore/), 2018-01-18: "We are delighted to be part of another iconic project in Singapore, and for our digital technologies to contribute to Singapore’s water sustainability journey."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
