# ABB wins order for Singapore's fourth desalination plant

ABB has won an order from Keppel Seghers to supply electrical, instrumentation, automation and control systems for the Keppel Marina East Desalination Plant in Singapore. The plant will produce 30 million gallons of fresh water per day and is expected to be completed by 2020.

- Type: Contract
- Announced: 2018-01-18
- Where: Singapore, Singapore
- Status: announced
- Capacity: 30 million gallons per day
- Products: electrical systems, instrumentation, automation and control systems
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [Keppel Seghers](https://endata.com/companies/359.md) (customer)
- [ABB](https://endata.com/companies/1547.md) (supplier)
- [PUB](https://endata.com/companies/21689.md) (partner)

## Sources

- [iaasiaonline.com](https://www.iaasiaonline.com/abb-power-pioneering-dual-mode-water-facility-singapore/), 2018-01-18: "ABB has won an order from Keppel Seghers... to supply complete electrical, instrumentation, automation and control systems for Singapore’s fourth desalination plant."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
