# Voronezh Aircraft Plant to invest $1.4M in modernization for new aircraft

Voronezh Aircraft Plant (VASO) will invest 82.5 million rubles ($1.4 million) in design documentation for retooling and reconstruction of workshops to produce IL-96-400M aircraft and components for IL-114-300. The modernization is planned to be completed by December 2018.

- Type: Investment
- Announced: 2018-01-16
- Where: Voronezh, Russia, Russia
- Value: $1.40M (82.5M RUB)
- Starts operating: Dec 2018
- Status: announced
- Products: IL-96-400M aircraft, IL-114-300 aircraft components
- Sectors: [Aerospace Components](https://endata.com/sectors/aerospace-components.md)

## Companies

- [Voronezh Aircraft Plant](https://endata.com/companies/29413.md)

## Sources

- [vestivrn.ru](https://vestivrn.ru/news/2018/01/16/voronezhskiy-aviazavod-rekonstruiruet-proizvodstvo-pod-novyie-samoletyi_2018-1-16_14-25/), 2018-01-16: "Воронежский авиазавод (ПАО «ВАСО») запустит процесс техперевооружения отдельных подразделений предприятия для изготовления самолетов ИЛ-96-400М и агрегатов для ИЛ-114-300."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
