# ABB wins order to retrofit six geothermal units at two Philippine plants for EDC

ABB won a multi-million-dollar order from Energy Development Corporation and its subsidiary Green Core Geothermal to upgrade six units at the Palinpinon 1 and 2 geothermal plants, including a new control system integration solution. The plants have a total capacity of about 200 MW.

- Type: Contract
- Announced: 2018-09-18
- Where: Valencia, Negros, Philippines
- Status: announced
- Capacity: approximately 200 MW
- Products: control system integration, turbine governor retrofit, digital control systems
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [ABB](https://endata.com/companies/1547.md) (supplier)
- [Energy Development Corporation](https://endata.com/companies/3893.md) (customer)
- [Green Core Geothermal](https://endata.com/companies/3894.md) (customer)

## Sources

- [thinkgeoenergy.com](https://www.thinkgeoenergy.com/edc-choses-abb-on-work-for-major-retrofit-for-two-geothermal-plants-in-the-philippines/), 2018-09-18: "ABB has won a multi-million-dollar order from Energy Development Corporation (EDC)"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
