# Construction begins on gas turbine plant in Rybinsk, Russia

A groundbreaking ceremony was held for a new plant to produce General Electric 6FA gas turbine units near Rybinsk, Yaroslavl Oblast, by the joint venture Russkie Gazovye Turbiny. The plant is expected to start operations in Q2 2014 with an initial capacity of 14 units per year, with investments of 5 billion rubles.

- Type: New facility
- Announced: 2017-12-13
- Where: near Rybinsk, Yaroslavl Oblast, Russia
- Starts operating: Q2 2014
- Status: under construction
- Capacity: 14 units per year
- Products: 6FA gas turbine units (77 MW)
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Russkie Gazovye Turbiny](https://endata.com/companies/28783.md)
- [General Electric](https://endata.com/companies/1262.md) (partner)
- [Rostec](https://endata.com/companies/8731.md) (partner)
- [Inter RAO](https://endata.com/companies/19600.md) (partner)

## Sources

- [dachtrubyu.at.ua](https://dachtrubyu.at.ua/news/v_jaroslavskoj_oblasti_nachalos_stroitelstva_zavoda_gazoturbinnykh_ustanovok/2017-12-13-312), 2017-12-13: "В окрестностях города Рыбинск Ярославской области состоялась торжественная церемония начала строительства завода по производству газотурбинных установок 6FA General Electric."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
