# Jinhua memory project FAB main plant tops out in Jinjiang, China

The FAB main plant of the Jinhua memory integrated circuit production line project in Jinjiang, China, has topped out after 420 days of construction. The first phase, with total investment of $5.3 billion, is expected to start production in Q3 2018 with 32nm 12-inch wafer capacity of 60,000 per month.

- Type: New facility
- Announced: 2017-11-21
- Where: Jinjiang, Fujian, China, China
- Value: $5.30B
- Starts operating: Q3 2018
- Status: under construction
- Capacity: 60,000 12-inch wafers per month (32nm)
- Products: memory chips, 32nm 12-inch wafers
- Sectors: [Semiconductors and Industrial Electronics](https://endata.com/sectors/semiconductors-electronics.md)

## Companies

- [Jinhua Integrated Circuit](https://endata.com/companies/28328.md)

## Sources

- [esmchina.com](https://www.esmchina.com/news/201711231122.html), 2017-11-23: "历经420天奋战，晋华存储器集成电路生产线项目FAB主厂房于11月21日举行封顶仪式。"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
